Concern PSA in Trnava

Beneficiary:Trnavainvest I, s.r.o.
Supplier:Chemkostav, a.s.
Construction duration:September, 2003 - November, 2003

Basic information

The purpose of this construction was to built up reinforced panel roads and areas for foundation of the construction site as well as construction of container establishment of the construction site for construction of newly built plant for production of passenger cards of the concern PSA in Trnava. The total length of built panel roads is 4920 m and the area of foundation of the construction site is 31 660 m2.

The object of construction site foundation is temporal administration building and consists of 20 containers, out of which 18 pieces are for offices and two of them are sanitary. The containers are fitted against each other and there is a corridor designed among them. The corridor is lighted by roof skylight. The object is one-floor, fully electrified, connected to water supply and sewage.