Investor: |
Slovenské energetické strojárne, a.s. |
|---|---|
Supplier: |
Chemkostav a.s. |
Construction duration: |
I/01 - |
Basic information: |
The power station Strarobeševo is located in southern-eastern part of Ukraine, in the Doneck region. It is an object of heavy industry. The aim of the construction is to decrease gas and heating oils consumption in a substantial way, to replace black coal combustion by sludge produced in existing block, to decrease emissions and to introduce a technology of fluid combustion in atmospheric circulating layer in Ukraine. The project is supervised by Donbasenergo and financed by EBRD (European Bank for Reconstruction and Development) and ECA (Exporting Credit Agencies). The proficiency of the project results from making use of freshly produced sludge and sludge stored in settling tanks. Such products shall be combusted due to technology of combustion in circulating fluid layer under an optimal share of sludge and black coal.
These products have to be dried. Respecting the variety of the sludge being dried, a rotating pipe drying machine was made. The sludge is lead to the boiler during short periods of time several time a day with maximum exploitation of stocks. The entire project shall comply with the criteria of reliability, safety, fire and explosion resistance, health protection at work, and hygiene. Equipment is designed for operating life of 40 years. The lifetime of wearable parts of the boiler shall not be shorter than 2 years and their replacement shall mean no difficulties for the customer. The whole equipment is centrally regulated from the vellum. The equipment shall be used for operation at the basic output, but it is not limited to it, and it can be used for operations on the highest output in the following years depending on the demands for electric current in Ukraine. |