Investor: |
Autostyl, s.r.o., Michalovce |
|---|---|
Supplier: |
Chemkostav a.s. |
Construction duration: |
VII/02 - V/03 |
Basic information: |
The building is solved from the architectonic point of view in accordance with Design-Manual prepared by the company Peugeot.
The additional building shall continue the existing building of care exhibition room. The additional building is divided in two main parts: car repair shop and car shop. The car shop directly continues the central reception, through which it is connected with the car repair shop. The car repair shop is divided into four main operational plants: mechanic workshop, varnish workshop with spraying box and quick repair shop. The part of the building is formed by car repair shop technology, which solves both guarantee and after-guarantee repairs of passenger cars.
|









