www.chemkostav.eu
Aquapark Raztoky, I.stage
Investor: |
Tatra Development Group, a.s. |
|---|---|
Supplier: |
Chemkostav a.s. |
Construction duration: |
X.02 – VII.03 |
Basic information: |
The purpose of the construction "Thermal Swimming Pool TATRALANDIA" is to create the premises for rest, recreation, swimming, and making use of attractions on the northern bank of Liptovská Mara dam. The construction is a set of service centre with solarium, Water Paradise with toboggans and six relax swimming pools with thermal water. Architectonic solution forms the substance of service centre into clear forms with assessment of functional background for artistically abundant water areas. The ground plan of the object is formed into regular rectangle emphasizing two-floor substance at the entry into the area and restaurant. The roof planes are designed askew with shaped connection to individual roof planes and roofed entrance. The object architecture reflects the Celtic motif using the entry tower, palisade in front of the southern façade, stone casing and wooden elements in the building façade. The façade of the building is yellow ochre, windows and doors are made of brown plastic, socle part is made of structural natural stone. The object is roofed by system of askew roofs, there is a roof plane designed in four angles over the main substance, from the side for visitors it has a character of mansard, in the eastern part there is a console with two angles. The roof has pyramid shape over the entrance and restaurant. In the object architecture there are significant artistic elements of towers, which form dominants at the entry and the restaurant part of the building. Small towers with pyramid roofing are applied in the building architecture and from the functional view they light hall premises or in the restaurant part they create stairway to toboggans. Roofing by SYENIT roofing black slate. The lighting of attic premises in the western part is through gamble dormers, in the eastern part trough skylights. The object is adjusted by reinforced areas, communications, and garden adjustments in its surroundings. Upon the building permission from the water supply management, the following objects were implemented within the construction: sewage, drainage in the value of SKK 6,698,421.00 |











