Treatment of Deep Creek in the village Brestov

Beneficiary:Municipality Brestov
Supplier:Chemkostav, a.s.
Construction duration:October, 2011 - October, 2012

Basic information

The purpose of proposed project is reliable, economical and safe drainage of surface water from Deep Creek basin. The construction consists of three buildings, of the very creek treatment, rebuilding of foot bridge and bridge over Deep Creek.
The main reason of the creek treatment is its bad and hydraulically poor stage, which results in regular annual water dislocation and flooding. By adjusting the flow, an appropriate degree of protection against high waters, was ensured. Because of treatment section in question it´s necessary to rebuild the foot  bridge and bridge leading over the Deep Creek, whose brightness is insufficient, it shows a lots damages, it lacks the sidewalk and the width of communication is insufficient.
A new proposed bridge is of reinforced concrete with a massive concrete pillars and right path. Within the object the reconstruction of adjoining road sections was also performed.