Reconstruction of the village center Stakcin

Beneficiary:Obec Stakčín
Supplier:Chemkostav, a.s.
Construction duration:September, 2010 - June, 2011

Basic information

Planned project activities are focused exclusively on space in the village centre. Local roads and pavements are in poor technical condition with missing asphalt cover and Historical Park, which dominates the village center, is currently not functional as being used as public space for gathering people. There will be reconstructed 1445.58 meters of the local roads and 1436.31 m of pavements.

There will be embedded the new curbs, old asphalt will be replaced by new pavement´s tiles, in the center there will be the new bus stops constructed. In the park will be distributed small architecture elements thus benches, bicycle racks, trash bins and information panels; the green surfaces will be restored and new shrubs and trees will be planted.

The dominant feature of the park will be the reconstructed fountain with amphitheater for acts of public cultural events.